Enertech UPS Pvt Ltd
  UPS systems
uninterrupted power supply, UPS systems
 

HOW WE ENSURE QUALITY IN FINAL PRODUCT

DESIGN ACTIVITY

  • Projects based on market feedback
  • Detailed specs sheet prepared before start of design
  • State of art, reliable & easily available components only used.
  • Ease of maintenance-prime design factor
  • Inhouse CAD design facility with self diagnostics features
  • Detailed testing from design to ensure all specs are adhered
  • Contract with external agencies for type approval tests.

DOCUMENTATION SYSTEMS :

1. Inward QC - sampling methods & relevant test points

2. Feed back system of field problems converted to changes in quality charts and check list at various stages

3. Testing points at assembly and testing

4. R&D efforts based on field problems

TRAINING TO ENGINEERS FOR :

A) Product Testing       B) CAD Operations
C) Servicing                 D) Quality Control